Contractor: Pinal Energy
Location: Maricopa, AZ
To appreciate the work done on this project, be sure to look at both the "before" and "after" pictures. There was a tremendous amount of sticky material that had built up at the ethonal plant on the concrete base walls. As sticky and tough as it was, it was no match for our hydro blaster.
The last two pictures show one of our men running the blaster down one of the stacks at the same ethanol plant 70 feet off the ground. Keeping their system clean is a top priority to maintain efficiency.